Page Hero Block

Kendall West Wastewater Rate Schedule

Block Group
Text Block - Normal - Left

Wastewater Rate Schedule for the Tapatio Springs service area.

Rate Schedule: Tapatio Springs & Shoreline

 

Sewer Rate Schedule

Meter Size 5/8" or 3/4" 1" 1½" 2" 3" 4" Rate per 1000 gallons
Monthly Minimum Charge $62.09 $155.23 $310.45 $496.72 $931.35 $1552.25 Includes 0 Gallons
  Per 1,000 gallons $5.01

 

New Sewer Accounts/Winter Averaging
New Accounts: Those connections without a history of water consumption shall be charged a lesser than 4,200 gallons per month or actual usage until a winter month’s average is established.
Winter's month average: Volume charges are determined based on average water consumption for winter, including the following months: December, January, and February. A connection with a separate irrigation meter will only be billed their sewage charge on their domestic use meter volume.

 

Regulatory Assessment Fee (TCEQ Mandated Fee) 1% of the monthly retail bill



System Improvement Charge 

Meter Size Monthly Charge
5/8"  $13.19
3/4" $19.78
1" $32.97
1 1/2" $65.94
2" $105.51
3" $197.83
4" $329.72
6" $659.43


New Service Fees
Description Fees

Customer Deposit

Deposit will be returned to the account in 18 months if there are no penalties or when the account is closed. The deposit can be waived with a Letter of Credit from a utility company which the applicant has had no less than 12 months of service, showing no penalties, late fees, or NSF checks.

$50.00

Commercial and Non-Residential Deposit

i.e., Bulk Water Meter ($400.00).

1/6th of the estimated annual bill

New Service / Account Setup Fee (non-refundable)

A useable service line, meter box, and meter HAVE been established at the lot. Only the customer is new to this location.

$35.00

Sewer Tap Fee

Tap fee covers the Utility's costs for materials and labor to install a standard residential 5/8" or 3/4" meter an additional fee to cover unique costs is permitted if listed on this tariff.

$600.00

Tap Fee (Unique costs)

For example, a road bore for customers outside of subdivisions or residential areas

Actual Cost
Tap fee (Large meter) 
Tap fee is the Utility's actual cost for materials and labor for meter size installed
Actual Cost


Miscellaneous Fees
Description Fees

Reconnection Fee Per Meter

The reconnect fee must be paid before service can be restored to a customer who has been disconnected for the following reasons:

   a) Nonpayment of bill (maximum $25.00)

   b) Customers request

$25.00

$35.00

Late Penalty

A one-time penalty may be made on delinquent bills but may not be applied to any balance to which the penalty was applied in a previous billing

10% of the bill
Returned Check Fee $30.00

Transfer Fee

The transfer fee will be charged for changing an account name at the same service location when the service is not disconnected.

$35.00

Meter Conversion Fee

This fee may be charged if a customer requests a change of size of an existing meter or a change is required by material change in customer's service demand.

Actual cost to convert the meter

 

Spacer - Medium