Thriving communities depend on reliable, high-quality water service. By maintaining existing infrastructure and investing in expansion and replacement projects, we help protect the water quality and reliability our customers depend on today and for generations to come.
Texas Water Company (TWC) has planned a robust capital improvement program for 2026, focused on strengthening water and wastewater treatment, protecting water quality, and enhancing storage and distribution infrastructure throughout our service areas.
TWC's water and wastewater distribution system spans more than 889 miles throughout our Hill Country service areas. Many sections of this infrastructure have served customers for decades and require ongoing maintenance, upgrades, expansion, and repairs to preserve reliable service. These improvement projects help protect and strengthen our water and wastewater system while supporting the needs of our communities.
About the project: The Canyon Lake Hills Main Line Project is a major infrastructure upgrade designed to improve water service reliability, increase system capacity, and support the community's long-term needs. The project will replace aging water mains with larger, more efficient infrastructure that can deliver more water throughout the system and help support fire protection.
Status: Under construction
Why This Project Is Needed: This project will replace aging water mains, many of which were installed in the late 60’s and 70’s, with larger, more efficient infrastructure that can deliver more water throughout the system.
Impacted Area: Canyon Lake Hills. Most work will occur along the roadside within the county right-of-way. Some road crossings may be necessary during construction.
About the project: Install five dedicated water sampling stations to support water quality testing while minimizing disruptions to the community.
Status: Construction is complete and awaiting final sign-off.
Why This Project Is Needed: The sampling station allows water quality samples to be collected directly from the water main, making the process faster and more efficient. It also helps minimize the need to collect samples from customers' homes or local businesses.
Impacted Area: Texas Country Estates subdivision. Most work will occur along the roadside within the county right-of-way.
Expected Completion: November 2026
About the project: Build a new 300,000-gallon elevated water storage tank to help maintain reliable water pressure and strengthen service for customers in the area.
Status: Under construction
Why This Project Is Needed: Providing water throughout the Hill Country presents a particular challenge because water must be moved uphill across varying elevations. One approach is to install multiple pumping stations along the system; however, pumps can fail and depend on electricity, backup generators, or other mechanical power. Elevated storage tanks provide another way to maintain consistent pressure across the hilly service area without relying continuously on pumps. They store water during periods of low demand, release it during peak use, and provide additional system redundancy.
Impacted Area: Preserve at Elm Creek
Expected Completion: December 2027
About the project: Build a new 1.5-million-gallon elevated water storage tank to help maintain reliable water pressure and strengthen service for customers in the area.
Status: Under construction
Why This Project Is Needed: Elevated storage tanks provide a way to maintain consistent pressure across our hilly service areas without relying continuously on pumps. They store water during periods of low demand, release it during peak use, and provide additional system redundancy.
Impacted Area: Simmons Valley Development off I-281
Expected Completion: 2027
About the project: Approximately 7,800 feet of existing water main will be replaced with new 12-inch ductile iron cement-lined (DICL) pipe to improve the reliability and long-term performance of the water system.
Status: Under construction
Why This Project Is Needed: The existing water main has reached the end of its service life, leading to frequent breaks and service disruptions.
Impacted Area: Mystic Shores units 7 and 10.
Expected Completion: December 2026
About the project: Build a new 300,000-gallon elevated water storage tank to help maintain reliable water pressure and strengthen service for customers in the area.
Status: Under construction
Why This Project Is Needed: Providing water throughout the Hill Country presents a particular challenge because water must be moved uphill across varying elevations. One approach is to install multiple pumping stations along the system; however, pumps can fail and depend on electricity, backup generators, or other mechanical power. Elevated storage tanks provide another way to maintain consistent pressure across the hilly service area without relying continuously on pumps. They store water during periods of low demand, release it during peak use, and provide additional system redundancy.
Area: Paradise on the Guadalupe
Expected Completion: December 2027
About the project: Build a new 2-million-gallon elevated water storage tank to help maintain reliable water pressure and strengthen service for customers in the area.
Status: Under construction
Why This Project Is Needed: Elevated storage tanks provide a way to maintain consistent pressure across hilly service area without relying continuously on pumps. They store water during periods of low demand, release it during peak use, and provide additional system redundancy.
Impacted Area: Purlsong Development on I-46
Expected Completion: 2027
About the project: Build a new wastewater treatment plant that can treat up to 250,000 gallons per day, with the capacity to expand to 500,000 gallons per day as the area grows. The plant will use an advanced membrane bioreactor system to produce high-quality reclaimed water for irrigation at Tapatio Springs Hill Country Resort and the adjacent golf course.
Status: Completed, Oct. 2026
Why This Project Is Needed: The existing Kendall West Facility treats approximately 150,000 gallons of wastewater per day. This project will expand regional treatment capacity to support growth west of Boerne and Interstate 10. Treatment equipment will be housed within a metal building, and all treatment tanks will be below ground to reduce the facility’s visual footprint and enhance safety. The facility also includes safeguards to protect groundwater, surface water, and human and environmental health.
Area: Tapatio Springs and surrounding areas west of Boerne and Interstate 10.
Expected Completion: Completed October 2026.
Have questions about a project?
Contact our Customer Service team for construction updates, accessibility support, or questions about planned service interruptions. For urgent water service issues, please use the emergency service contact at 830-312-4600 and select Option 4.
Stay Connected:
Update your communication settings and contact information in your Customers Portal to receive alerts via email, text, or voice.